After several years and several generators, our Hilltop Science Center is finally connected to the electrical grid. These additional 40,000 square feet of greenhouse and laboratory space are fully sealed, climate controlled, light assisted, and shade cloth equipped. This adds an additional facility to our year-round cannabinoid research and development campuses. When breeding seed devoid of THC and high in CBD, CBG, and other novel cannabinoids, it is absolutely imperative to have a contamination-free environment. These greenhouses were built specifically with that in mind. Time to fill them with plants!
